Strata - Established 1981
Strata Accreditations

Featured Projects

Our continual investment in training, combined with our extensive experience, enables us to provide a professional and comprehensive service in the specialised field of commercial window and door fenestration. With contracts ranging from £100 to £1 million, you can be certain with Strata that we have the resources to complete any installation with the minimum of fuss and disruption.

Project: ALLEYENES HIGH SCHOOL

THE BRIEF: White Upvc (Rehau) curtain walling to school science block. All elevations including courtyard. Structural steel coupling system used clad in Upvc to suit frames. Thermally efficient insulated panels installed.

COMPLETED: 01/06/2012 .

BUDGET: £100,000 to £125,000

BEFORE

AFTER

Project: BIDDULPH HIGH SCHOOL

THE BRIEF: Installation of White Upvc (Rehau) Orangery to enclose main entrance area. Two glazed atrium style lantern roofs installed with highly energy efficient glass. High level casements fitted with automated openers for ease of operation. loading calculations to give maximum structural integrity. All underside frames were coupled using necessary wind. The flat roof area around the lanterns is a Glass reinforced Plastic coating (GRP).

COMPLETED: 8/11 .

BUDGET: £60,000 to £80,000

COMPETED WORKS

Project: CANNOCK CHASE HIGH SCHOOL

THE BRIEF: Installation of White Upvc (Rehau) windows and Aluminium doorsets. All elevations of the school required window and door upgrades. Strata took on the installation after being approached by the Staffordshire County Council surveyors who insisted that Strata complete the installation as they felt that this would be the better option as far as H&S / capability was concerned.

ONGOING – COMMENCED 8/12 .

BUDGET: £225,000 – £260,000

BEFORE

AFTER

Project: CHESTERTON SWIMMING POOL

THE BRIEF: Installation of White Upvc Windows (Rehau). Shaped frames were required on this installation due to the roof being located directly above. The overall approximate length of window runs was 25 metres that required critical and accurate site measurements in order to facilitate the and exact fit. The installation was located within the main swimming pool area so Health and safety issues were paramount in particular. Anti Sun glass was installed to reduce the glare and reflection into the pool area.

COMPLETION: Summer 2012 .

BUDGET: £30,000 to £40,000

BEFORE

AFTER

Project: THE MADELEY SCHOOL

THE BRIEF: Removal of single glazed aluminium windows and doors. Installation of White Upvc (Rehau) Curtain Walling and Aluminium doors. Highly energy efficient glazing was installed to greatly increase the efficiency of the classrooms. All Curtain Walling was installed using the Structural steel coupling system to give maximum ridgidity and strength. Insulated panels, colour co ordinated to school colours were installed.

THE BUDGET: £40,000 to £50,000

Which? Trusted Trader
Green Deal Approved
CHAS
Constructionline